|
Current Name |
Windward |
|
Previous Name |
Pelayo (until 2005), Windward (until 2003), Werra (1984), Werra Express (until 1984), Freudenfels (until 1980), Aristotelis (until 1976) |
|
Classification Society |
Germanischer Lloyd |
|
IMO |
7374113 |
|
Call Sign |
ELZI8 |
|
Operator |
EMES Denizcilik ve Nakliyat A.S., Istanbul, Turkey |
|
Manager |
Ciel Shipmanagement S.A., Athens, Greece |
|
Owner |
Seafather Maritime Ltd., Monrovia, Liberia |
|
Flag |
Liberia |
|
Port of Registry |
Monrovia |
|
Type of Ship |
feeder container ship |
|
Completion |
1974 |
|
Shipyard |
Mitsui Shipbuilding & Engineering Co. Ltd., Osaka, Japan |
|
Building No. |
982 |
|
GT |
14.400 |
|
DWT [t] |
21.885 |
|
Overall Length [m] |
170,77 |
|
Registered Breadth [m] |
22,86 |
|
Maximum Draught [m] |
9,38 |
|
Propulsion [KW] |
6.914 |
|
Propulsion [BHP] |
9.400 |
|
Speed [Kn] |
16,0 |
|
Capacity Containers [TEU] |
924 |
|
Additional Information |
originally 3rd ship of a series of identically constructed cargo ships (3 vessels), also see >MSC Arabia< - converted from general cargo ship and lengthened in 1979 - on November 26th 2008 the ship was beached Alang for demolition by Indian breakers |